The Gippsland Basin joint venture between Esso Australia, a subsidiary of ExxonMobil, and Woodside Energy completed drilling five new production wells under the Turrum Phase 3 project, with the Valaris 107 jackup demobilized from the Marlin B Complex following the campaign. The wells target underdeveloped gas resources in the Turrum and North Turrum fields, located …
The post Valaris 107 completes five-well Turrum Phase 3 campaign appeared first on Drilling Contractor.
News
